Olympic Park 2012

Your Unofficial Guide to the Olympics in London 2012 – building work, news and views.

Olympic Park 2012 header image 2

Last ‘Big build’ Starts with Handball Arena

July 21st, 2009 · 1 Comment

Work has begun on the last of the major permanent structures. The Handball Arena will be used for Basketball, Wheelchair Basketball, Boxing, Handball, Badminton, Judo, Netball, Futsal (5-a-side indoor football) and Volleyball.

With (recycled) copper cladding and glazing for a view into the action, I think this building will look distinctive despite the regular shape. It will be sited a little north of the Stadium, and you can see how it will look in this picture from the ODA. The design includes taking natural light and rain water through pipes into the building for use in the facility.

Handball Arena

As a legacy venue it should be a flexible space, according to Peter Rogers (CE of the London Development Agency) “With the equivalent space of 12 badminton courts and retractable seating, the venue has been designed for all levels of sports participation and has the potential to accommodate cultural, entertainment and business events.” The promise is also that it will include a health and fitness club with changing facilities and a café for the local public.

Tags: Legacy · Olympic Site Construction · Olympics 2012 Delivery

1 response so far ↓

Leave a Comment